Phases During Construction
View in Flash
View in Silverlight
View the construction and traffic overview factsheet (2.0 MB).
PHASE I: December 2009 - 2011
Traffic on Doyle Drive, Construction Occurring Adjacent to Existing Roadway
From the start of construction through late 2011, Doyle Drive will continue to operate as it does now, while portions of the new Presidio Parkway are built adjacent to the existing highway structures.
Traffic to and from the Golden Gate Bridge and 19th Ave/Hwy 1 will remain flowing throughout construction. This corridor is a construction zone with continually changing conditions, so delays may occur. However, the connections between 19th Ave and the Golden Gate Bridge will remain open.
During this phase, two Highway 1 ramps will be closed (NB Doyle Drive to
SB Park Presidio/Hwy 1 and NB Park Presidio/Hwy 1 to SB Doyle
Drive). See
details about the ramp closures.
3-Day Weekend Closure of Doyle Drive
In late 2011 there will be a 3-Day Weekend Closure of Doyle Drive
to transfer traffic onto a temporary bypass and completed southbound structures.
PHASE II: 2011 - 2013
Traffic Transferred onto a Temporary Bypass
In late 2011, traffic will be shifted onto a bypass next to Doyle Drive with five lanes - wider than those on the existing Doyle Drive - and with opposing traffic flows separated by a median barrier. Although there will be one less lane on the temporary bypass than on the old Doyle Drive, these wider lanes and the median barrier will increase safety and traffic flow. The temporary bypass will accommodate the same capacity as the current Doyle Drive.
3-Day Weekend Closure
In late 2013 there will be a 3-Day Weekend Closure of Doyle Drive to transfer traffic from the temporary bypass onto the final Presidio Parkway.
FINAL ALIGNMENT: 2013
Traffic on the Final Presidio Parkway
In late 2013, major construction will be complete and traffic will be on the final Presidio Parkway. Final project activities after this will include removal of the temporary detour and landscaping.