Press Center
The Press Center is a centralized location for members of the press to access information about the Doyle Drive Replacement Project. High-resolution images and roadway simulations are available for download.
For media and press inquiries, please send an e-mail to media@doyledrive.org. View Press Releases.
Lincoln Boulevard and Tunnel Construction Simulations
*Some of these materials are Windows Media movie files and are very large. Please allow extra time for download.
| 3D/4D modeling tool demonstrating construction of the Southbound Battery Tunnel and Temporary Bypass |
 |
| Download | Save [Windows
Media 12.0 MB] |
| Simulation of Future Battery Tunnels and Main Post Tunnels |
 |
| Download | Save [jpg
6.4 Mb] |
| Before and After Simulation |
Future Lincoln Blvd Over Tunnels |
Existing Lincoln Blvd and Doyle Drive |
 |
 |
| Download | Save [jpg
712 kb] |
Download | Save [jpg
186 kb] |
Videos
*These videos are Windows Media movie files and are very large. Please allow extra time for download.
Phase 1 Construction: Late 2009 – Late 2011 |
 |
| Download | Save [Windows
Media 88.0 MB] |
| Oscillator Rig & Bridge Foundation Construction |
 |
| Download | Save [Windows
Media 50.0 MB] |
| Highway 1 Traffic Shift, North of MacArthur Tunnel |
 |
| Download | Save [Windows
Media 7.0 MB] |
| Rare Manzanita Relocation - Narrated |
 |
| Download | Save [Windows
Media 34.6 MB] |
| Long-Term Ramp Closures and Initial Construction Activity |
 |
| Download | Save [Windows
Media 14.8 MB] |
High-Resolution Images
Click a thumbnail image or the download link below
to view the high-resolution version. You can then
save the file generated.
Project Images
| New Alignment Beginning August 15, 2010 |
 |
| Download | Save [jpg
6MB] |
| At the Palace of Fine Arts looking west - Future project |
 |
| Download | Save [jpg
273kb] |
Before and After Simulations
Simulations
*These simulations are Windows Media movie files and are
very large. Please allow extra time for download.
Simulation showing the transition from the current roadway to the Presidio Parkway, which is expected to be completed in 2014. |
 |
| Download | Save [Windows
Media 20 MB] |
| Fly-through of the future Doyle Drive replacement, the
Presidio Parkway, starting from the Golden Gate Bridge to
the Palace of Fine Arts |
 |
| Download | Save [Windows
Media 342MB] |
| Draft 3D-4D model tool demonstrating the first phase
of construction process on the western end of the project |
 |
| Download | Save [Windows
Media 14.2MB] |